The bedrooms and hallway remodels were a result of remodeling the office in 2003. Rough T&G incense cedar was again used for all the ceilings, and for the entry closet outside and inside.
|
|
Painting the roof and oiling the upper parts is another future project, but not by me |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The attic before, with most of the old shredded newspaper removed (I moved what I could down between the walls for insulation) and with some of the plywood flooring already installed |
|
|
|
|
|
|
|
|
|