In late February, we decided to undertake a project that had been lingering in the background since we bought the house: insulate the back room that we use as the office. We first removed all the 1/4-inch plywood covering the walls, installed insulation, drywall, and then the drywall mud. We next sanded the walls, primed them, and painted everything white, using the left-over paint we had used for the kitchen. Finally, we installed 1 x 8 rough cedar on the ceiling with smooth cedar for the trim molding. It no longer feels like the inside of a refrigerator when we enter the room in the mornings.
On the right is a picture of how the room
looked shortly after we bought the house. The next three are pictures of how the rest of house looked for 9 days after we removed everything from the room. |
|
|
The guest bedroom |
View from dining room |
|
The Office, insulated and with drywall installed |
Detail of ridge seam |
|
Drywall mud applied |
Sanded and painted, with ceiling
started |
|
Finished |
Finished 2 (except for painting
the closet door) With all the stuff back |
|
Door painted and with
Gwen Florea's