In late February, we decided to undertake a project that had been lingering in the background since we bought the house: insulate the back room that we use as the office.  We first removed all the 1/4-inch plywood covering the walls, installed insulation, drywall, and then the drywall mud. We next sanded the walls, primed them, and painted everything white, using the left-over paint we had used for the kitchen. Finally, we installed 1 x 8 rough  cedar on the ceiling with smooth cedar for the trim molding.  

It no longer feels like the inside of a refrigerator when we enter the room in the mornings.

 

On the right is a picture of how the room looked shortly after we bought the house.   

The next three are pictures of how the rest of house looked for 9 days after we removed everything from the room.

 

The guest bedroom


Our bedroom

View from dining room

The Office, insulated and with drywall installed

Detail of ridge seam

Drywall mud applied


Sanded and painted, with ceiling started

Finished

Finished 2 (except for painting the closet door)

With all the stuff back

Door painted and with Gwen Florea's (www.paintnames.com
picture mounted on the wall